top of page

Palmetto Expressway Capacity Improvement

Ongoing

SR-826 and 103rd street

HIGHLIGHTS

Major Express Lanes Modifications

Post Tension Bridge Construction

7 Bridge Widenings

100K SF of MSE Wall Widening

Asphalt Paving

$67 Million

SR 826 Palmetto Expressway from South of NW 36th St. to North of NW. The addition of one general purpose lane southbound from NW 74th Street to north of NW 103rd Street, conversion of express (managed) lanes to general purpose lanes, as well as traffic operational and geometric design improvements on SR 826/Palmetto Expressway from South of NW 36th Street to North of NW 154th Street within Miami-Dade County.154th St. (Miami Lakes Dr.). The improvements are proposed to address existing congestion and higher than expected speed differentials between the general purpose lanes and the express lanes along the project corridor, as well as provide additional access to the EL system.

AGLogo.png

© 2024 Asphalt Group, Inc. All Rights Reserved