top of page

Florida TPK at Boynton Beach Blvd (FDOT District 8 FTE)

Ongoing

SR 91 from MP. 86.617 to MP. 87.276

HIGHLIGHTS

Three Span Bridge Widening Over Turnpike Canal

Mainline Turnpike Widening

Offramp Reconstruction

Widening/Reconstruction of Boynton Beach Blvd

$10 Million

This project will enhance the northbound off-ramp from Florida’s Turnpike Mainline/SR 91 to Boynton Beach Boulevard/SR 804 by extending the auxiliary lane and widening the ramp from one to two lanes. In addition, turn lanes and intersection improvements, including upgraded signals, will be added at the ramp’s connection with Boynton Beach Boulevard/SR 804. The northbound on-ramp from Boynton Beach Boulevard/SR 804 to Florida’s Turnpike will undergo milling and resurfacing. A new left-turn lane will also be added on westbound Boynton Beach Boulevard/SR 804 to provide better access to the northbound on-ramp.

AGLogo.png

© 2024 Asphalt Group, Inc. All Rights Reserved

bottom of page